How we work

From a plot of land to a live teleport

LiveTelco finds and secures the land, obtains the permits and builds the teleport, so operators install on a site that is ready, licensed and approved.

How we develop our greenfield teleports

no obstructions above 20–30°

1 · Acquire the land

Titles checked, land visited, topography, soil and RF surveyed, then the plot is secured by our local entity.

SHELTER GEN DEMARC N ↑

2 · Design, permit & prepare

Site plan, perimeter, power, fibre and antenna pads prepared in 7–10 months, while operators obtain their licences.

3 · Host & operate the facility

Operators' antennas are installed within 3–5 months of licensing; LiveTelco keeps the teleport secured, powered and maintained 24/7.

Site Acquisition

Every plot in our network passed the same checks. When an operator needs a new country, LiveTelco acquires the land, holds it through a local entity and adds it to the network, with full site documentation, site plan, boundary survey and imagery.

Title & document checks

Title deed, ownership, zoning documents and expert reports validated, with references taken on every landowner.

Site visits

Every plot is walked by our team, with 360° photos from each point to confirm no obstruction or interfering activity.

RF & line-of-sight audit

Clear 360° horizon at 20–30° elevation, no interfering emissions on site, and a detailed RF audit with our partner.

Studies

  • Soil analysis
  • Topography
  • Environmental study when required

Permitting

Land approved for teleport and satellite installation and operation by the local authorities.

Fibre & power mapping

Carrier topology, POPs and DWDM confirmed; 3-phase grid adjacent; costs and lead times known upfront.

Land contracts

Purchase, long lease with option to buy, usufruct or Musataha, held by LiveTelco with full rights to host operators' antennas.

Permits & Local Authorities

Some jurisdictions require airport, military, environmental, community and health approvals before a construction permit, which can take up to a year in some countries. LiveTelco knows the authorities, works in the local language and drives every approval.

Land & planning

Land-use approval, master plan and site layout, building and construction permit, completion certificate.

Environment & safety

EIA, aviation and antenna-height clearance, fire safety and civil defence, emission health & safety reports.

Utilities & telecom

Power connection, fibre right-of-way, and support with gateway authorisation and earth-station licensing.

Transparent fees

A fixed permitting fee, with government fees passed through at cost with receipts, within an agreed cap.